Skardu Airport Runway Partially Closed for Maintenance Until June 28, Causing Flight Schedule Disruptions

Introduction

Skardu Airport runway has been partially closed for maintenance work until June 28, leading to expected disruptions in flight operations to and from the region. According to aviation authorities, the maintenance is necessary to ensure runway safety and improve long-term infrastructure performance at one of Pakistan’s key tourist airports in Gilgit-Baltistan. During this period, limited flight operations may continue, but passengers are advised to check updated flight schedules before traveling.

The Skardu Airport runway maintenance closure is likely to affect both domestic travelers and tourists planning visits to the scenic northern areas.

Runway Closure Schedule and Details

As per the official notification:

  • Runway Affected: 14L/32R
  • Daily Closure Timing: 8:00 AM to 4:00 PM
  • Duration: Until June 28

During these hours, routine flight operations will not be conducted on the specified runway.

The closure is part of a planned maintenance program aimed at improving long-term airport safety and performance.

Maintenance Work Being Conducted

The ongoing upgrade includes multiple critical improvements to enhance runway quality and reliability.

  • Seal coating of runway surface
  • Repair of cracks and surface damage
  • Repainting of runway markings
  • General infrastructure safety upgrades

These measures are designed to ensure compliance with aviation safety standards and improve aircraft handling conditions.

Emergency Availability of Runway

Authorities have clarified that despite the scheduled closure, the runway can still be made available for emergency operations.

Emergency protocol includes:

  • Prior coordination with air traffic control
  • Minimum one-hour advance notice required
  • Conditional reopening based on operational feasibility

Leave a Reply

Your email address will not be published. Required fields are marked *